PREMIUM ACCOUNTS

Support downtopc by buying or renewing your premium account using below links:







Partners
warezload

movieblogarea download
katzdownload

Quantity surveying (Taking off Quantities of Civil work)

Category: Courses
Author: DrZero
Date added: 25.07.2022 :32:45
Views: 21
Comments: 0










Description material



Published 07/2022
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz, 2 Ch
Genre: eLearning | Language: English + srt | Duration:12 lectures (3h 31m) | Size: 2.95 GB


Taking off and estimation of all civil and building works quantities


What you'll learn
The basics of taking off Quantities of building works (Substructure and superstructure)
Learn the right methods of taking off for concrete works and formwork
Learn how to estimate Quantities of steel using the Bar bending Schedule
Learn How to make an abstract of the Quantities

Requirements
Anyone with some knowledge about construction works
A student taking Quantity surveying/civil engineering and related fields
Anyone who wants to kickstart their career in quantity surveying

Description
Taking off and estimation of quantities of civil and building works extracted from both architectural and structural drawings.

We will start with the substructure, this includes items such as site clearance, removal of trees, Removal of topsoil, and excavation to reduced levels. Trench excavation and pad excavation, concrete blinding and foundation footing, the plinth wall, concrete for the stub columns, hardcore and sand blinding, anti-termite treatment, BRC, Dpm, and the ground floor concrete slab to grade.

Next, we shall deal with the superstructure which includes walling, and walling finishes, floor finishes, concrete works on columns, slabs, and beams,

We shall cover formwork for all the items such as slabs, beams, and columns.

And finally, we will conclude with the steel works, which we will carry out the take-off process with the help of a bar bending schedule.

We shall get quantities for steel in kg, using the bar bending schedule template I have designed for you, it's simple

What you will get!

A free template for taking off in Microsoft office excel

A free bar bending schedule template that simplifies the task of taking off of works for steel.

Knowledge of taking off and estimation using Microsoft office excel.

How to make an abstract after the taking off process.

Who this course is for
Anyone who wants to kickstart their career in quantity surveying
A student taking Quantity surveying/civil engineering and related fields






https://nitro.download/view/2455EA3C79FE5F4/Quantity_surveying__%28Taking_off_Quantities_of_Civil_work%29.part1.rar
https://nitro.download/view/EE22217186CD64E/Quantity_surveying__%28Taking_off_Quantities_of_Civil_work%29.part2.rar
https://nitro.download/view/F14C890E96DDDC1/Quantity_surveying__%28Taking_off_Quantities_of_Civil_work%29.part3.rar
Warning! You are not allowed to view this text.



Join to our telegram Group
Information
Users of Guests are not allowed to comment this publication.
Choose Site Language
Keep downtopc Online Please

PREMIUM ACCOUNTS

Support downtopc by buying or renewing your premium account using below links: